Dolomite processing contains four stages; coarse crushing of jaw crusher, medium and fine crushing of impact or cone crusher, and shaping stage of sand making machine.

♦ The first stage: Coarse Crushing

The lump dolomite will be transported to the material bin by the truck. Then the forklift or the worker will put the material into the jaw crusher for crushing until the material size is smaller than the maximum feeding size of the grinding machine

♦ The second stage: Medium and Fine Crushing

The crushed dolomite will be lifted to the storage bin by the elevator, then the material will pour down from the hopper and be transported by the feeder evenly to the crushing machine.

♦ The third stage: Sand Making

During the grinding process, the qualified material will go to the collector through the pipe after screening. The collected material is the final product and will be discharged from the pipe, for the disqualified material, it will go through the grinding process again.

♦ The fourth stage: Finished Products

The purified airflow goes into the air blower through the air pipe above the separator. The winding path is a circle. Besides the path between the air blower and grinding chamber is positive pressure, all the air in the pipes is negative pressure. The sanitary situation is good.

Dolomite Processing Plant

Dolomite processing contains four stages; coarse crushing of jaw crusher, medium and fine crushing of impact or cone crusher, and shaping stage of sand making machine.

♦ The first stage: Coarse Crushing

The lump dolomite will be transported to the material bin by the truck. Then the forklift or the worker will put the material into the jaw crusher for crushing until the material size is smaller than the maximum feeding size of the grinding machine

♦ The second stage: Medium and Fine Crushing

The crushed dolomite will be lifted to the storage bin by the elevator, then the material will pour down from the hopper and be transported by the feeder evenly to the crushing machine.

♦ The third stage: Sand Making

During the grinding process, the qualified material will go to the collector through the pipe after screening. The collected material is the final product and will be discharged from the pipe, for the disqualified material, it will go through the grinding process again.

♦ The fourth stage: Finished Products

The purified airflow goes into the air blower through the air pipe above the separator. The winding path is a circle. Besides the path between the air blower and grinding chamber is positive pressure, all the air in the pipes is negative pressure. The sanitary situation is good.


Related Products

Thank You for Your Attention to Nairy Machinery !

Please write down your requirement and contact details in the following form. You can also send a message to us by this email info@lynrjx.com, we will reply to you within 12 hours.  

Luoyang Nairy Machinery Equipment Co., Ltd. (hereinafter referred to as Nairy) was founded in Luoyang, the Holy City of China. After years of innovation and development, Nairy products have made historic breakthroughs in the supply of sand and gravel system equipment and spare parts, the supply of belt conveyors, the research and development and supply of solid waste recycling equipment...

share
share
share
Add

Company

Guohong Advanced Manufacturing Industrial Park, No. 18 Xiaowen Avenue, Yibin District, Luoyang City, Henan Province

Add

Address

66 Longhua Avenue, Airport Industrial Cluster, Mengjin District, Luoyang City, Henan Province

Message

Please write down your requirement and contact details in the following form. You can also send a message to us by this email lucy@lynrjx.com, we will reply to you within 12 hours.  

Submit

©2023 Luoyang Nairy Machinery Equipment Co., Ltd.  | Taglist | Business license

©2023 Luoyang Nairy Machinery Equipment Co., Ltd.