1. Project introduction:
The SK Hydropower Project in Pakistan is located on the Kunar River in the Cape Province of Pakistan, 265 km east-north of Islamabad.With a total installed capacity of 873,000 kilowatts and a planned construction period of 72 months, the project will have an annual generating capacity of 3.081 billion kilowatts upon completion, which will further alleviate the energy shortage in Pakistan and lead the energy cooperation of the China-PakistanEconomic Corridorto new glory.This project is a supporting sand and gravel system of Sujijinari Hydropower Station (SK Hydropower Station for short), which is undertaken by China Gezhouba Group Co., Ltd. in Pakistan. It is located at the first of the diversion tunnel. Our company undertook the project design, equipment procurement and construction guidance of this project.
2. Project name: Sand and stone processing system at the first of SK hydropower station in Pakistan
3. Construction time: 2017
4. Construction site: Khyber Province, Pakistan
5. Construction content: Feed port of primary crusher to finished aggregate yard
6. Construction unit: China Gezhouba Group No. 3 Engineering Co. LTD
7. Project scale: 150 t/h river pebble sand production line
8. Production technology: Four stage crushing (including sand making, rod grinding), wet production
9. Type of finished product: 0-4.75mm,4.75-9.5mm,9.5-19mm,19-38mm